About Us
Services
Experience
Projects
Knowledge Centre
DESIGN WIZARD
Contact
0212 674 97 28
Solar PV Technical Resources
Solar PV Services
Maintenance and Troubleshooting
Technical Documents
Frequently Asked Questions
Cost Guide
View detailed project pages
Reference information, location and photos for each project.
Konya Livestock Market Rooftop Solar — Turnkey EPC (1.65 MWp)
Darende Municipality Ground-mounted Solar — Turnkey EPC (850 kWp)
Gümüşova Municipality Ground-mounted Solar — Turnkey EPC (1.20 MWp)
Karaçulha Produce Market Rooftop Solar — Turnkey EPC (920 kWp)
Karre Su Ürünleri Rooftop Solar — Turnkey EPC (480 kWp)
Kemaliye Boylu Ground-mounted Solar — Turnkey EPC (120 kWp)
Teskol Seramik Rooftop Solar — Turnkey EPC (1.60 MWp)
Gürün Çiftlik Rooftop Solar — Turnkey EPC (48 kWp)
Malatya Şok Depo — Site Installation (1.00 MWp)
Malatya Municipality Maski — Site Installation (1.00 MWp)
Günöz Tekstil — Site Installation (12.00 MWp)
Eroğlu Gıda — Site Installation (1.00 MWp)
İda Asansör — Site Installation (1.00 MWp)
Ceylan Karavil AVM — Site Installation (2.20 MWp)
Çakıroğlu Helva — Site Installation (500 kWp)
Ilsan Tekstil — Site Installation (2.20 MWp)
Akmezra Village 6 systems — Site Installation (6.00 MWp)
Malatya İnönü University — Site Installation (5.30 MWp)
Göçmez Kayısı Ground-mounted Solar — Site Installation (1.60 MWp)
Öz Ekin Grup Rooftop Solar — Site Installation (1.20 MWp)
Ömer Kavak — Operation and Maintenance (300 kWp)
Ziyaettin Işık — Operation and Maintenance (171 kWp)
Mehmet Demiröz — Operation and Maintenance (243 kWp)
Emin Altınbaş — Operation and Maintenance (243 kWp)
Mümtaz altınbaş — Operation and Maintenance (387 kWp)
Ahmet Özkan — Operation and Maintenance (2.50 MWp)
Recep Aydın — Operation and Maintenance (216 kWp)
Fehmi Kevşek — Operation and Maintenance (288 kWp)
Cantek Tavukçuluk (Mesut Can) — Operation and Maintenance (315 kWp)
Şenol Öztop — Operation and Maintenance (198 kWp)
İsmet Demirtaş — Operation and Maintenance (288 kWp)
Erol Aydın — Operation and Maintenance (288 kWp)
Ayhan Projectsbilen — Operation and Maintenance (262 kWp)
Mehmet Özkan2 — Operation and Maintenance (405 kWp)
Quberz Tekstil — Operation and Maintenance (800 kWp)
SCM Tekstil — Operation and Maintenance (1.20 MWp)
Kenza Tekstil — Operation and Maintenance (600 kWp)
Fetih Tekstil — Operation and Maintenance (2.10 MWp)
Meda Boya — Operation and Maintenance (405 kWp)
Silkar Madencilik — Operation and Maintenance (1.00 MWp)
Silkar Madencilik — Operation and Maintenance (943 kWp)
Özra Gıda San. Tic. Ltd. Şti. — Operation and Maintenance (1.00 MWp)
Şampiyon Otomotiv — Operation and Maintenance (1.20 MWp)
Solid Waste Facility ( Yeşilyurt Municipality) — Operation and Maintenance (1.50 MWp)
Ilıcaklar Tekstil Ground-mounted — Operation and Maintenance (3.50 MWp)
Motsa Mühendislik — Operation and Maintenance (180 kWp)
Cavzer Tekstil — Operation and Maintenance (250 kWp)
Şahintürk Tekstil — Operation and Maintenance (6.00 MWp)
Günerpen — Operation and Maintenance (522 kWp)
MASKİ — Operation and Maintenance (6.00 MWp)
Fehmi Eroğlu — Operation and Maintenance (300 kWp)
Akdeniz Tekstil — Operation and Maintenance (800 kWp)
Ilıcaklar Tekstil Rooftop — Operation and Maintenance (827 kWp)
Başgimpa — Operation and Maintenance (600 kWp)
CES Kompozit — Operation and Maintenance (600 kWp)
Spes Metal — Operation and Maintenance (288 kWp)
İlhan — Operation and Maintenance (450 kWp)
Gündüz Tavukçuluk — Operation and Maintenance (1.44 MWp)
File Market — Operation and Maintenance (2.00 MWp)
Sistem Reklam — Operation and Maintenance (600 kWp)
Barkın Plastik — Operation and Maintenance (452.5 kWp)
Çorlu Metal — Operation and Maintenance (3.52 MWp)
May Deri — Operation and Maintenance (1.20 MWp)
Nalçacılar Nakliyat — Operation and Maintenance (240 kWp)
Bolu Birlik Et — Operation and Maintenance (414 kWp)
Tatlıpınar GES — Operation and Maintenance (59.65 MWp)
Fırat Plastik — Operation and Maintenance (13.65 MWp)
Kayalar Plastik — Operation and Maintenance (2.00 MWp)
Kutay Oluklu Mukavva (Connection Approval) — Operation and Maintenance (561 kWp)
Mikropak Ambalaj (Connection Approval) — Operation and Maintenance (1.61 MWp)
Enlem Gıda (Connection Approval) — Operation and Maintenance (786 kWp)
Bora Plastik (Connection Approval) — Operation and Maintenance (736 kWp)
Gamma Pak Sterilizasyon (Connection Approval) — Operation and Maintenance (279 kWp)
Çağ Kabara (Connection Approval) — Operation and Maintenance (700 kWp)
Yılmaz Evye (Connection Approval) — Operation and Maintenance (784 kWp)
Nurtel Tel Sanayi (Connection Approval) — Operation and Maintenance (529 kWp)
Fabal Alüminyum (Connection Approval) — Operation and Maintenance (2.97 MWp)
CAGS TOBACCO (Connection Approval) — Operation and Maintenance (2.64 MWp)
Albond Alüminyum (Connection Approval) — Operation and Maintenance (2.38 MWp)
Peri Kalıp ve İskeleleri (Connection Approval) — Operation and Maintenance (413 kWp)
Yurda Örme Tekstil (Connection Approval) — Operation and Maintenance (192 kWp)
Arfen Alüminyum (Connection Approval) — Operation and Maintenance (632 kWp)
Kemiteks Kimya — Operation and Maintenance (1.43 MWp)
Anadolu İsuzu — Operation and Maintenance (7.40 MWp)
Gökçeada Elta — Operation and Maintenance (500 kWp)
Soyyiğit — Operation and Maintenance (1.80 MWp)
llsan Tekstil Ground-mounted — Operation and Maintenance (9.48 MWp)
Siirt Medipolitan — Topographic Surveys and Planning (23.00 MWp)
Siirt Medipol — Topographic Surveys and Planning (20.00 MWp)
Kırşehir 80 MW — Topographic Surveys and Planning (80.00 MWp)
Ankara 200 MW — Topographic Surveys and Planning (200.00 MWp)
Ankara 45 MW — Topographic Surveys and Planning (45.00 MWp)
Kırıkkale BİM 45 MW — Topographic Surveys and Planning (45.00 MWp)
Ağrı 50 MW — Topographic Surveys and Planning (50.00 MWp)
Ağrı 55 MW — Topographic Surveys and Planning (55.00 MWp)
Ağrı BİM 72 MW — Topographic Surveys and Planning (72.00 MWp)
Afyonkarahisar 40 MW — Topographic Surveys and Planning (40.00 MWp)
Afyonkarahisar Solar PV Project — Topographic Surveys and Planning (120.00 MWp)
Siirt Solar PV Project — Topographic Surveys and Planning (240.00 MWp)
Batman 40 MW — Topographic Surveys and Planning (40.00 MWp)
Batman 7.40 MW — Topographic Surveys and Planning (7.40 MWp)
Çorum Solar PV Project — Topographic Surveys and Planning (125.00 MWp)
Denizli Merkas 5 MW — Topographic Surveys and Planning (5.00 MWp)
Bingöl 51 MW — Topographic Surveys and Planning (51.00 MWp)
Batman 28 MW — Topographic Surveys and Planning (28.00 MWp)
Batman 14 MW — Topographic Surveys and Planning (14.00 MWp)
Ankara 112 MW — Topographic Surveys and Planning (112.00 MWp)
Eskişehir 112 MW — Topographic Surveys and Planning (112.00 MWp)
Eskişehir 80 MW — Topographic Surveys and Planning (80.00 MWp)
İstanbul Istanbul University Cerrahpaşa Campus — Topographic Surveys and Planning (100 kWp)
Kars 130 MW — Topographic Surveys and Planning (130.00 MWp)
Ankara 100 MW — Topographic Surveys and Planning (100.00 MWp)
Konya Solar PV Project — Topographic Surveys and Planning (4.40 MWp)
Kütahya 20 MW — Topographic Surveys and Planning (20.00 MWp)
Elazığ 6 MW — Topographic Surveys and Planning (6.00 MWp)
Elazığ Efor Çay 2 4.5 MW — Topographic Surveys and Planning (4.50 MWp)
Elazığ Efor Çay 1 5.4 MW — Topographic Surveys and Planning (5.40 MWp)
Mardin 170 MW — Topographic Surveys and Planning (170.00 MWp)
Mardin 70 MW — Topographic Surveys and Planning (70.00 MWp)
Muğla Solar PV Project — Topographic Surveys and Planning (50.00 MWp)
Muğla Solar PV Project — Topographic Surveys and Planning (3.00 MWp)
Nevşehir Huqqa 2 MW — Topographic Surveys and Planning (2.00 MWp)
Nevşehir Atasay 2 MW — Topographic Surveys and Planning (2.00 MWp)
Niğde Bony Çorap 2 5 MW — Topographic Surveys and Planning (5.00 MWp)
Uşak 1 MW — Topographic Surveys and Planning (1.00 MWp)
Uşak 1 MW — Topographic Surveys and Planning (1.00 MWp)
Uşak 0.13 MW — Topographic Surveys and Planning (130 kWp)
Şanlıurfa 171 MW — Topographic Surveys and Planning (171.00 MWp)
Tunceli Solar PV Project — Topographic Surveys and Planning (200.00 MWp)
Iğdır 116 MW — Topographic Surveys and Planning (116.00 MWp)
Mardin 21 MW — Topographic Surveys and Planning (21.00 MWp)
Bolu YEKA — Topographic Surveys and Planning (50.00 MWp)
Elazığ YEKA — Topographic Surveys and Planning (100.00 MWp)
Erzurum YEKA — Topographic Surveys and Planning (130.00 MWp)
Erzurum YEKA — Topographic Surveys and Planning (150.00 MWp)
Erzurum YEKA — Topographic Surveys and Planning (100.00 MWp)
Eskişehir YEKA — Topographic Surveys and Planning (120.00 MWp)
Eskişehir YEKA — Topographic Surveys and Planning (150.00 MWp)
Kahramanmaraş YEKA — Topographic Surveys and Planning (50.00 MWp)
Mardin YEKA — Topographic Surveys and Planning (70.00 MWp)
Van YEKA — Topographic Surveys and Planning (50.00 MWp)
Konya 20 MW — Topographic Surveys and Planning (20.00 MWp)
Düzce Gümüşova Municipality 0.5 MW — Topographic Surveys and Planning (500 kWp)
Malatya Darende Municipality 1 MW — Topographic Surveys and Planning (1.00 MWp)
Çankırı Solar PV Project — Topographic Surveys and Planning (150.00 MWp)
Eskişehir 6.32 MW — Topographic Surveys and Planning (6.32 MWp)
Kütahya 15 MW — Topographic Surveys and Planning (15.00 MWp)
Darende Solar PV Project — Topographic Surveys and Planning (100.00 MWp)
Adilcevaz Solar PV Project — Topographic Surveys and Planning (100.00 MWp)
⌕
Project Categories
First 5 Projects
Project Details
Tap to enlarge
Directions
‹
›
0 / 0
View full project details ↗
Project
Project Code
Capacity
Coordinates
×
‹
›
Double tap to zoom in or out