Establish the usable roof area
Gross roof area is not the installable area. Account for roof edges, chimneys, skylights, parapets, shading, fire access and maintenance corridors. A qualified structural review must assess the existing roof, attachments and relevant wind and snow loads.
Protect the building and its operation
Choose mounting details for the actual roof construction and waterproofing system. Plan lifting, deliveries, access, fall protection and electrical isolation around the facility’s operations. Inspect watertightness during installation and record the final condition.
Match the design to the load
Use hourly or representative interval consumption where available. Shift patterns, weekends and seasonal demand affect self-consumption. Two factories with identical annual consumption can need different solar designs. Confirm grid connection limits and document the electrical and structural design together.
Put the guidance into practice
Record site measurements, manufacturer specifications and modelling assumptions separately. Compare options on the same basis and verify the final design against the actual site.